Handover & Takeover Checklist

What has to change hands when a committee, contractor or agent changes. Anything not handed over on the day is usually never handed over.

Ready to use in your browser. Download the file as it is, with a clean layout.

CSV opens in Google Sheets, Numbers and on a phone. The printable version below needs nothing at all.

What is in it

Handover & Takeover Checklist columns and example rows
# Item Held by (outgoing) Received by Date Condition / gaps
1 Asset register, current
2 Maintenance log, last 3 years
3 Keys and access cards, with a list
4 Contractor list with contacts and contracts
5 Outstanding jobs, with status
6 Warranties and certificates
7 Utility accounts and meter readings
8 Insurance policy and claims history
9 Plans and drawings
10 Reserve or sinking fund balance and commitments

The rows above are examples, not instructions. Replace them with your own.

How to use it

Work through it in one sitting with both parties present. The Condition / gaps column is the important one: recording that something could not be handed over, and why, is far more useful than leaving the row blank.

A blank row reads as done to whoever finds it later. A row saying "no warranty paperwork found for the pumps" is a known gap someone can act on.

What it deliberately leaves out

It assumes nothing about your governance structure, because that varies enormously. Add rows for anything specific to your situation, and keep the completed sheet: it is the evidence that the handover happened at all.