Compliance & Oversight
Facilities Compliance: an auditable schedule per asset
Attach a recurring check to the asset or area it actually covers, and Laksana raises each occurrence when it falls due, records who completed it and when, and holds the checklist result and photo evidence against that occurrence, so the trail exists before anyone asks for it.
- Fire extinguisher · quarterly
- Lift 2 · due 30 Oct
- Status: Overdue
- Verified by: Supervisor
The problem
The calendar reminder fires. Nobody knows if the check happened.
Where is last month's lift service slip?
The record is a paper slip. Lift service slips and extinguisher tags sit in a drawer until the auditor asks, then someone hunts.
When is the fire pump test due?
Due dates live in calendars. Laksana turns each compliance requirement into a verified recurring task with complete proof of execution, identity, and time.
All ticked. No need to check again.
A tick may be forty seconds. An inspection closed in under a minute counts the same as a real walk-round.
How It Works
Define it once. It recurs on its own.
A compliance programme is a template, the assets it applies to, and a frequency: everything after that is generated.
1
Define the check
Template once. Build the checklist, decide whether photo evidence is mandatory, set the frequency, and set a completion target in minutes if the check has one.
2
Attach it to what it covers
Per-asset schedule. Apply the template to the specific assets and areas it governs. Each attachment generates its own occurrences, each with its own due date.
3
Complete, verify, keep
Evidence, then sign-off. Field staff complete the checklist with evidence. Where you require verification, a nominated role reviews and approves or rejects it before it counts as done.
Key Benefits
Overdue is an actionable state
Instant dashboard filters. Every occurrence carries a due date and a status, so outstanding checks are filtered immediately on the dashboard.
A second pair of eyes, where you want one
Named-role verification. Checks can require verification by a named role before they close, with an approval or a rejection reason recorded against the occurrence.
Comprehensive quality signals
Minimum working time. A completion target and a minimum working time can be set per check, so an inspection closed in forty seconds is visible clearly with real inspection duration.
Works With
The parts it leans on
Compliance Checklists
The inspection form. The checklist itself: how an inspection is structured and completed on site.
Time and GPS evidence
Proof of place. The photo attached to a check, stamped with time, location and site as it arrives.
Preventive Maintenance
Same recurrence. The same recurrence machinery applied to maintenance work orders rather than inspections.
Reports & Share Links
Auditor-ready output. Compliance activity for a period as a PDF or a link, filtered by site and asset.