Skip to content
Laksana

Work-Order Log

One row per job, from the moment it is reported to the moment the reporter is told it is done. The smallest thing that stops work getting lost.

Ready to use in your browser. Download the file as it is, with a clean layout.

CSV opens in Google Sheets, Numbers and on a phone. The printable version below needs nothing at all.

What is in it

Work-Order Log columns and example rows
Ref Date raised Raised by Building Location What Owner Assigned to Date closed Reporter told Cost Notes
2026-001 2026-09-02 Unit 14 Block A Stair core, 3rd Light out on landing S. Ahmad In-house 2026-09-04 Yes
2026-002 2026-09-03 Caretaker Block B Bin store Door will not latch S. Ahmad J&K Joinery Awaiting part

The rows above are examples, not instructions. Replace them with your own.

How to use it

Fill it in at the moment the job is reported, not at the end of the day. Retrospective logs have gaps, and the gaps are always on the busy days, which are the days that generate the complaints people remember.

Note the Reporter told column. A job is closed when the person who raised it has been told, not when the work was done. Those are different moments and only the second one is visible to them.

What it deliberately leaves out

No priority column. Almost every log that has one ends up with everything marked urgent within a month. Sort by age instead: the oldest open row is the agenda.

Get new guides by email

A short note when we publish something new. Product updates only. Unsubscribe any time.