Skip to content
Laksana

How to run a weekly lift and escalator fault count for your building

Laksana
Laksana Editorial
November 20, 2026
How to run a weekly lift and escalator fault count for your building
Photo: Fons Heijnsbroek (Wikimedia Commons), CC0, cropped

A weekly count of lifts and escalators that are out of service tells a building team where it stands. Here is a simple way to run one every Monday, and what each line of the count should show.

Why a weekly count helps

A count is only as good as the log behind it. When every fault is recorded the moment it is reported, and closed the moment it is fixed, the number for the week comes straight from that log. Anyone on the team can pull it in a few minutes, and anyone reading it sees the same picture.

Step 1: List every lift and escalator

Make one line per unit. Give each unit a short name and a location, such as "Lift 2, Block B lobby" or "Escalator 1, Level 1 to Level 2". Add the contractor who services it and the day of its last service. This is the list your count runs against, so every unit appears once.

If you use Laksana, add each unit as an asset and print its QR code. Stick the code on or beside the unit, and anyone who scans it reports against the right unit.

Step 2: Log each fault when it is reported

Every fault needs four details, taken at the time of the report:

  • which unit
  • when it was reported
  • who owns the fix
  • what was seen, with a photo if possible

Residents, guards and cleaners already send these details in chat. Laksana turns a WhatsApp or Telegram message, or a QR scan, into an issue with an owner and a deadline, so the log fills as people report.

Step 3: Close each fault with a photo

A fault is closed when the unit runs again. The person who fixed it sends a closing photo, stamped with the time and, where the phone shares it, the place. The closing time then sits on the same record as the report time, and the gap between them is how long the unit was out of service.

Step 4: Pull the count every Monday

Use the same four lines every week, so each week reads the same way as the last.

Line What it shows
Units out of service now Units with an open fault at the time of the count
New faults this week Faults reported since last Monday
Faults closed this week Faults closed since last Monday
Oldest open fault The unit, and how many days it has been open

Keep the layout on one page. A building manager reads it in a minute, and a committee reads it at the next meeting.

Step 5: Share the page and act on the oldest fault

Send the one-page count to the people who decide. Then start the week with the oldest open fault: ask who owns it, what is holding it up, and when it will be closed. Laksana shows each issue's owner, deadline and status, so the answer is on the record when the question is asked.

You can also share a report as a link, so the committee sees the same count you do.

Make it a Monday habit

The routine takes four moves: list the units, log each fault, close each fault with a photo, and pull the count. Run it for a few weeks and the count turns into a conversation about the oldest open fault, and that conversation moves repairs along.

See it on your own building

We'd be glad to walk you through a weekly fault count using your own lifts and escalators.

Book a demo

Laksana is a product of Delyva Sdn Bhd.

Ready to upgrade your operations?

See why leading facility management teams are switching to Laksana AI.

Start now Book a demo